Guntamatic maintenanceCall Novis +39 0342 1898960
EN

Boiler room design

Boiler, buffer tank, fuel store and distribution are designed together.

Two people in work clothes review a technical drawing beside a Guntamatic PRO boiler.
Review of a technical drawing beside a PRO boiler.

What we assess

Design requires sizing, space checks and a study of the connection to the existing system. Permits and component compatibility must also be checked. The proposal states who handles each phase and which services are included.

Heat demand

Sizing starts from the thermal characteristics and use of the building.

Space

Access for deliveries is needed, plus space to move fuel and carry out maintenance.

Who does what

Phases and any professionals involved are defined for each project.

Frequently asked questions

01What is the difference between pellets, log wood and wood chips?+
The fuel's form, the space needed to store it, how it is loaded and the daily work all differ. Pellets and wood chips can feed the boiler automatically; log wood is loaded by hand.
02How much does a biomass boiler cost?+
The boiler price is only part of the cost: components, storage, building work and installation are added. For a quote we need your building's details and the output required.
03Can you assess a boiler plant for a hotel?+
You can send the property's details for an initial comparison. Novis will then review with you the site, the activities and the services to include in the project.
04Are there incentives or funding options?+
Yes. Novis looks for grants and funding in Italy and Switzerland, checks whether the project meets the requirements and handles the paperwork. To start, tell us where the building is and what work you plan.
NEXT STEP

Let's talk about your system.

Request an assessment