Guntamatic maintenanceCall Novis +39 0342 1898960
EN

Biomass heating solutions

A house and a hotel use heat differently. We start with the building to choose the fuel, boiler and buffer tank.

A POWERCHIP boiler with the screw feed running directly to the storage bunker wall. The wood chips are visible through an internal window.
POWERCHIP with side feed from the wood chip store.

What we assess

We need only a few details to start: what kind of building it is, how much output it requires, how much space there is for fuel and who will look after the boiler.

The boiler

Pellets, wood chips and log wood are loaded and stored in different ways. Cleaning and day-to-day management also vary from one household to another.

The surrounding system

Buffer tanks, distribution and controls get the heat where it is needed.

Building data

Consumption, rooms and the existing system are needed to compare the options.

Frequently asked questions

01What is the difference between pellets, log wood and wood chips?+
The fuel's form, the space needed to store it, how it is loaded and the daily work all differ. Pellets and wood chips can feed the boiler automatically; log wood is loaded by hand.
02How much does a biomass boiler cost?+
The boiler price is only part of the cost: components, storage, building work and installation are added. For a quote we need your building's details and the output required.
03Can you assess a boiler plant for a hotel?+
You can send the property's details for an initial comparison. Novis will then review with you the site, the activities and the services to include in the project.
04Are there incentives or funding options?+
Yes. Novis looks for grants and funding in Italy and Switzerland, checks whether the project meets the requirements and handles the paperwork. To start, tell us where the building is and what work you plan.
NEXT STEP

Let's talk about your system.

Request an assessment